3. Post Install Functional Tests and Verification


We conduct a minimum 24-hour end-to-end network performance test during install to ensure the required specifications are met:
• Providing outcome documentation for your risk management purposes
• Offering a collaborative approach of working together with your staff
• Analysis of data capture during our survey in the coverage area
• May provide real time fix or improvement scenario if necessary
• Provision of verification report and user acceptance test

You are about to visit a Philips global content page

Continue

Our site can best be viewed with the latest version of Microsoft Edge, Google Chrome or Firefox.

You are entering a Philips Healthcare Australia website
Please select the checkbox

The information on this site is not intended for consumers. The information is directed exclusively to health professionals, health practitioners, persons who are purchasing officers in hospitals, and persons who are engaged in the business of wholesaling therapeutic goods (as per s42AA of the Therapeutic Goods Act 1989 (Cth), and s6 of the Therapeutic Goods (Therapeutic Goods Advertising Code) Instrument 2021).

By clicking “Continue” you are indicating that you are one of the intended audiences. Click cancel to be redirected to the Philips website.